Laserfiche WebLink
<br />stormwater discharge permit as is currently in affect is appropriate and sufficient for this <br />operation. The operator will forward any coorespondence to DMG as soon as it is a~~ailable. <br />15. From your comments on page 2 of your adequacy review coorespondence dated 12-26-96, I <br />assume that the design of the storm ditch from pond # 1 across the existing pit and stockpile area <br />to the north end of the existing pit is acceptable to the Division. From that point non:hwards to <br />sediment ponds 5, 6, and 7, a stormditch will be constructed with the following desil~r criteria: <br />the ditch dimensions will minimally facilitate the maximum peak discharge anticipated, 200 cfs, <br />in a trapezoid shaped with minimum 4 feet measured across the bottom of said ditch and 2:1 <br />sloping sides with minimum depth of ditch 2 feet vertical. This will result in a ditch dimension <br />of app. 12 feet wide as measured across the top of the ditch. Where the ditch is located in bed- <br />rock, no geotextile liner will be used. In areas where soils or other unconsolidated material is <br />encountered, Typar Class A Drainage Geotextile (CDOT specification) will be applied prior to <br />rip-rap placement. The typar geotextile will be secured to the surface via 6" steel staples on 3 <br />foot centers where possible and sides of the typar will be interlocked into the soil by trenching, <br />stapling, and backfilling the edge of the geotextile in a 6" deep ditch running along the edge of <br />the typar application. At intervals of 50 feet, the typar liner will be interlocked to the: substrate <br />materials via a 1 foot deep by 1 foot wide trench cut perpendicular to the line (across) the ditch <br />direction. The typar will be folded into the trench, stapled, and backfilled prior to continuing <br />with the typar application in the ditch. The interlocking cross ditch trenching will al::o be used <br />for all end of run and joining of separate typar sections. A graphic representation of a typical <br />typar installation can be reviewed following page 6 in the permit application package which <br />shows a typical spillway construction method, with the exception of the rip-rap placement. <br />Rip-rap placement will follow current CDOT and Corp of Engineers design criteria fir <br />placement and depth of rip-rap placement in drainage channels and storm ditches. Along the <br />path the stormditch, rip-rap will be sized as follows: less than 2% grade, up to 1 foot rip-rap <br />placed directly on a bed rock ditch or on typar liner at a minimum depth of 2 feet, at ;trades of 2- <br />4%, minimum 1 foot rip-rap up to 2 foot diameter rip-rap placed at a minimum depth of 4 feet <br />on bedrock or properly installed geotextile, and in runs of ditch over 4% grade, minir, rum 2 foot <br />rip-rap up to 3 foot rip-rap placed at a minimum depth of 6 feet over bedrock or geotextile. The <br />exact location of the inlet of the first (upper) sediment pond will be based on placing the <br />sediment ponds as low an elevation as possible within the affected land boundaries for the <br />longest effective term of use given the slow but continuing lowering of final elevation within the <br />pit. The mine operator will utilize the existing topographic features (natural drainage channels) <br />as much as possible to connect the stormflow diversion with the series of sediment ponds. A <br />constant grade from the north end of the existing pit area to the first sediment pond is not <br />planned. Flatter stretches of ditch will be connected to steeper runs of ditch follovvin;; the <br />general guidelines as explained above. With these parameters in mind, it is likely that most of <br />the storm ditch path will be lined with 3 foot rip-rap minimally 6 feet deep. This siziag and <br />depth of rip-rap is designed to stay in place and effectively handle stormflows up to 200 cfs and <br />stream velocities in excess of 15 fps. <br />5 <br />