My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-02-15_REVISION - M1983141 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983141
>
2006-02-15_REVISION - M1983141 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:33:23 PM
Creation date
11/21/2007 11:06:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983141
IBM Index Class Name
Revision
Doc Date
2/15/2006
Doc Name
Construction Costs for Hydraulic Bulkheads in Underground Mines
From
DMG
To
Mining and Environmental Services
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C._. ~.. <br />American Tunnel Bulkhead Costs <br />Page 4 <br />STRIP FORMS, MOVE EQUIPMENT AND GROUT AND REGROUT BULKHEAD: <br />(5 men - 4 days + 3 men - 5 days + 3 men - 15 days) <br />EQUIPMENTS <br />GD 83 Jackleq (in Misc Costs) <br />Grout Mixer 6 pump ($8500 value) 1 mo S 700 <br />@ 5700/mo; $250/wk 1 wk S 250 <br />Locomotive (in Misc Costs) <br />DIRECT LABOR @ $16.39/hr B00 $13112 <br />BENEFITS @ 35$ of wages $4589 <br />INDIRECT LABOR (outside man) @ $16.39/hr 240 $3934 <br />BENEFITS @ 35$ of wages $1377 <br />MATERIALS: <br />Packers @ $120 ea 4 $ 480 <br />Type V Portland Cement <br />(94/ bags) @ $5.60 20 $ 112 <br />Type III Portland Cement <br />(94~ bags) @ $9.50 40 S 380 <br /> SubTotal $24934 <br />MISC COSTS <br />ENGINEERING DESIGN Lump Sum $4535 <br />ENGINEERING INSPECTION (Design Engineer) $3067 <br />MATERIALS TESTING Lump Sum $ 806 <br />MISC SMALL HAND TOOL USAGE Lump Sum $3000 <br />MISC MATERIALS (ie nails, bits, wire, <br />hangers, oxygen, acetylene, etc) Lump Sum $3000 <br />DIESEL Lump Sum $ 700 <br />ELECTRZCITY $1600/mo 3 $4800 <br />AT LOCOMOTIVE & FLATCARS @ $6000/mo 3 $18000 <br />COMPRESSOR @ $3000/mo 3 $9000 <br />AIR-BEAN 2S PUMP @ $400/mo 3 $1200 <br />1 H.P. SUMP PUMP $480 purchase 1 $ 480 <br />GD 83 JACRLEG @ $375/IDO 3 $1125 <br />PHONES - COMMUNICATION SYSTEM TO SURFACE <br />@ $800 purchase 1 $ 800 <br />LOADER (outside) @ $6000/mo 3 $18000 <br />SAFETY SUPPLIES Lump Sum S3000 <br /> 3ubTotal $71513 <br />TOTAL AMERICAN TUNNEL BULKHEAD DIRECT COSTS $341,010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.