Laserfiche WebLink
C._. ~.. <br />American Tunnel Bulkhead Costs <br />Page 4 <br />STRIP FORMS, MOVE EQUIPMENT AND GROUT AND REGROUT BULKHEAD: <br />(5 men - 4 days + 3 men - 5 days + 3 men - 15 days) <br />EQUIPMENTS <br />GD 83 Jackleq (in Misc Costs) <br />Grout Mixer 6 pump ($8500 value) 1 mo S 700 <br />@ 5700/mo; $250/wk 1 wk S 250 <br />Locomotive (in Misc Costs) <br />DIRECT LABOR @ $16.39/hr B00 $13112 <br />BENEFITS @ 35$ of wages $4589 <br />INDIRECT LABOR (outside man) @ $16.39/hr 240 $3934 <br />BENEFITS @ 35$ of wages $1377 <br />MATERIALS: <br />Packers @ $120 ea 4 $ 480 <br />Type V Portland Cement <br />(94/ bags) @ $5.60 20 $ 112 <br />Type III Portland Cement <br />(94~ bags) @ $9.50 40 S 380 <br /> SubTotal $24934 <br />MISC COSTS <br />ENGINEERING DESIGN Lump Sum $4535 <br />ENGINEERING INSPECTION (Design Engineer) $3067 <br />MATERIALS TESTING Lump Sum $ 806 <br />MISC SMALL HAND TOOL USAGE Lump Sum $3000 <br />MISC MATERIALS (ie nails, bits, wire, <br />hangers, oxygen, acetylene, etc) Lump Sum $3000 <br />DIESEL Lump Sum $ 700 <br />ELECTRZCITY $1600/mo 3 $4800 <br />AT LOCOMOTIVE & FLATCARS @ $6000/mo 3 $18000 <br />COMPRESSOR @ $3000/mo 3 $9000 <br />AIR-BEAN 2S PUMP @ $400/mo 3 $1200 <br />1 H.P. SUMP PUMP $480 purchase 1 $ 480 <br />GD 83 JACRLEG @ $375/IDO 3 $1125 <br />PHONES - COMMUNICATION SYSTEM TO SURFACE <br />@ $800 purchase 1 $ 800 <br />LOADER (outside) @ $6000/mo 3 $18000 <br />SAFETY SUPPLIES Lump Sum S3000 <br /> 3ubTotal $71513 <br />TOTAL AMERICAN TUNNEL BULKHEAD DIRECT COSTS $341,010 <br />