My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-02-15_REVISION - M1983141 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983141
>
2006-02-15_REVISION - M1983141 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:33:23 PM
Creation date
11/21/2007 11:06:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983141
IBM Index Class Name
Revision
Doc Date
2/15/2006
Doc Name
Construction Costs for Hydraulic Bulkheads in Underground Mines
From
DMG
To
Mining and Environmental Services
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ ~ III Nlilllillllllll <br />INTEROFFICE MEMORAIVD UM <br />DZi?SIQM OF ffi!1ffiPALS Alien C80LOiGY' <br />TO: BRUCE HUMPIiRIFS, JIM STEVENS, <br />TOM GILLIS, ALLEN SORENSON <br />FROM: James Diliie <br />DATE: July 19, 1996 <br />RE: SUNNYSIDE MINE -Permit No. M-77-378 -Review of <br />Operator's Cost Estimate for Bulkhead Seal Replacement <br />I have completed a review of the operator's cost estimate for replacing the bulkhead seals <br />in the American and Terry Tunnels; I have also reviewed Tom Gillis' memo regarding <br />his review. <br />Except for the replacement of the upper seals, I fully agree with Tom's analysis and <br />recommendations. Replacement of the bulkhead seals, at some future date, will require <br />a specialty contractor who will probably mobilize from some considerable distance, need <br />to. recruit workers with underground mining experience and pay their living expenses <br />during the project. A substantial contingency cost will probably be included in the bid, <br />due to the many unknown variables. <br />I recommend that the operator re-calculate the bond requirement to include the costs <br />related to the items outlined in Tom Gillis' July 11, 1996 memo (excluding replacement <br />of the upper bulkhead seals). <br />M: bu1;~wlSumy~ide.j d <br />
The URL can be used to link to this page
Your browser does not support the video tag.