My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-02-15_REVISION - M1983141 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983141
>
2006-02-15_REVISION - M1983141 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:33:23 PM
Creation date
11/21/2007 11:06:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983141
IBM Index Class Name
Revision
Doc Date
2/15/2006
Doc Name
Construction Costs for Hydraulic Bulkheads in Underground Mines
From
DMG
To
Mining and Environmental Services
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
," 07!11/1996 10:37 303-247J" 04 MIPERALS 8 ~/ ~Y PAGE 04 <br />completely decossaissioaed by the time a bulkhead failure scenario <br />occurs, a contractor Mould aced to transport to the site all <br />equipimaat, materials, supplies, sad temporary offio•/shop <br />laoilitie• aeoeesazy to caa~lete the Mork. 711so, it would seem <br />reasonable to include app~opriats worker living sxpeasea siaca it <br />i• doubtful that a qualified coatraotor'• labor fore would be <br />located close enough to the site to make • daily com><ute possible. <br />5. nodl.rect costs. Coatractor'• overhead (13ability iasuraace, <br />psrfo----~~a hood, job superiateadeat, labor hordes), contraator'• <br />profit, a possible aoatingenoy cost due to the unique, unfamiliar <br />sad risky nature o! the work, sad the Itinerals Program ^tatutory <br />5k administrative fee, will seed to be added to the direct costs <br />in order to calculate a total bond aaouat. <br />/tdg <br />c:\gillis\a376cost.tdg <br />
The URL can be used to link to this page
Your browser does not support the video tag.