Laserfiche WebLink
<br /> <br />Susan Mowry <br />Tom Schreiner <br />Page 2 <br />NOV be ITEN7 <br />ACTION TAKEN <br />DATE COMPLETED <br />C-86-041 <br />Refuse Pile Ditch <br />C-86-042 <br />UTL Conveyor Bent <br />Bear Pond <br />Lower Refuse Pond <br />C-86-043 <br />Dozer Tracks <br />,.~~ ~~. <br />T~ ~ ~ <br />~C,~,,.-`ar ti.. <br />Cut Ditch Back to <br />Sediment Pond <br />May 9, 1986 <br />Cleaned Smail Amount <br />of Sediment from <br />North Side of Ditch May 16, 1986 <br />Removed Coel from <br />Beneath Bent, Built <br />Up Berm, Installed <br />Straw Bales Along <br />River and MB-3 <br />Spillway to Trap <br />Coal Fines May 14, 1986 <br />Extension Requested ~ _~y ~ <br />1 Week Due to Extended to <br />Inclement Weather 5-23-86 r <br />- Not Complete <br />as of 5-16-86 <br />Abatement Date <br />6-9-86 <br />Regraded, Raked, Rlay 14, 1986 <br />Seeded, and <br />Mulched with <br />Straw to Obtain <br />Reclamation of Area <br />Ceased Using Area May 9, 1986 <br />to Move Dozers <br />Additionally, a clean water ditch was cut along the south side of the <br />refuse extension area on hlay 14, 1986 as shown on the Lower Refuse <br />Pile Plan. <br />