Laserfiche WebLink
i <br />I. General Comments Continued <br />Ground water gene~'ated in the portal entries was being pumped via pipes and <br />ditches to pond MB #2 instead of MB #1. This is a temporary situation <br />necessitated by a clogging problem with the regular pipe network. MB #2 has <br />ample capacity to handle the water and does not present a problem. <br />Landslide stabilization activities are being conducted above the substation. <br />Topsoil was being stripped from an area east of the substation and transported <br />to the topsoil stockpile. <br />Most of the gob stored east of the shop/warehouse area has been removed. <br />Final grading had been done on a small area next to the new truck garage. <br />This area will need to be seeded this spring. <br />