Laserfiche WebLink
<br />Battle Mountain Gold <br />June 25 Additional Requirements & Status <br />page 2 <br /> <br />Jse all reasonably practical steps to continue to lower the cyanide <br />levels in the pond to the lowest reasonably achievable levels. <br />In the opinion of the Division, BMRI has diligently pursued the reduction <br />of cyanide levels in the tailings pond at the San Luis mine sit as <br />evidenced by the July 20, 1992 reported WAD cyanide levels of 1 ss than <br />5 ppm in the active lower tailings pond and less than 0.4 ppm i the <br />inactive upper tailings pond. The ponds have been maintained i this <br />range of cyanide concentration since that date. <br />