Laserfiche WebLink
EXHIBIT L -RECLAMATION COST <br />The information for this section is intended to satisfy the requirements outlined in Section 6.4,12 <br />of the Colorado Department of Minerals and Geology Construction Material Rules and <br />Regulations. <br />This amendment application has proposed to change the maximum area of disturbance to <br />approximately 58.6 acres. Assuming the maximum area of disturbance would be completely <br />mined yet not reclaimed, the processing area and haul roads will be disturbed and shoreline <br />reclamation will be in process for phase 7. Shoreline reclamation for phases 1 through 6 would <br />be complete. <br />The following Table describes the site condition and associated reclamation cost estimate. <br />HALL-IRWIN CORPORATION-THE SHORES AMENDMENT l {#M-1998-013) Page 21 of 29 <br />