Laserfiche WebLink
INSERTION INSTRUCTIONS <br />SENECA II-W MINE PERMIT G82.057 <br />TECHNICAL. REVISION (TR-56) <br />October 24, 2006 <br />TAB 13, Facilities. Vol. 7 <br />• Teat -replace pages 9 and 10 <br />TAB 13. Facilities, Vol. 7a <br />• Attachment 13-SF, Pond 016/016A Two-Pond System, As-Built Report, Pond 016/016A <br />Sedimentology Demonstration Certification -insert new certification statement and accompanying <br />material as Preface pages 2 - 5 <br />• Attachment 13-SF, Pond 016/O16A Two-Pond System, As-Built Report, Appendix 1, Pond 016 <br />Spillway Certification -replace existing certification with new certification statement <br />• Attachment 13-SF, Pond 016/016A Two-Pond System, As-Built Report, Appendix 1, Pond 016 As- <br />Bui1tReport, Addendum 13-SF-A 10-Yeaz 24Hour SEDCAD4 Results -replace existing 10-Year, <br />24-Hour SEDCAD modeling demonstration <br />• Attachment 13-SF, Pond 016/016A Two-Pond System, As-Built Report, Appendix 1, Pond 016 As- <br />Built Report, Addendum 13-SF-B 25-Year 24-Hoot SEDCAD4 Results -replace existing 25-Year, <br />24-Hour SF.DCAD modeling demonstration <br />• Attachment 13-SF, Pond 016/016A Two-Pond System, As-Built Report, Appendix 1, Pond 016 As- <br />Built Report, Addendum 13-SF-C Emesgenry Spillway Chrtfall Channel -replace existing Outfall <br />Channel material <br />• Attachment 13-SF, Pond 016/016A Two-Pond System, As-Built Report, Appendix 1, Hydrologic <br />Input Parameter Slipsheets -remove existing slipsheets. These slipsheets aze found behind the <br />existing Pond 16 Emexgenry Spillway Channel material and, in front of the page entitled <br />Sedimentation Pond 076, StabilityAnalytir ofA.r-Built Candikonr, November2000. These spreadsheets <br />have been replaced with the spreadsheets found on pages 13-SF-A.17 through 13-SF-A.28 <br />• Attachment 13-SF, Pond 016/016A Two-Pond System, As-Built Report, Appendix 1, Pond 016 As- <br />Built Report, Addendum 13-SF-D, Pond Ol G Final Geotechnirat Report and Summary -insert slip <br />sheet in front of page entitled Sedimentation Pond 076, StabilityAnalyrir ofArBuilt Conditionr, November <br />2000 <br />• Attachment 13-SF, Pond 016/016A Two-Pond System, As-Built Report, Appendix 1, Pond 016 As- <br />Built Report, Addendum 13-SF-E, Compaction Testing Result -replace existing slip sheet <br />• Attachment 13-SF, Pond 016/016A Two-Pond System, As-Built Report, Appendix 2, Pond 016A <br />As-Built Report -replace existing Pond 106A As-Built Report <br />TAB 13. Facilities. Vol. 9 <br />• Exhibit 13-9A, Pond 016 As-Built -replace Exhibit 13-9A <br />• Exhibit 13-9C, Pond 016A As-Built -replace Exhibit 13-9C <br />Seneca Coal Company • P.O. Box 670 • Hayden, Colorado 81639 <br />Telephone (970) 2763707 • FAX (970) 276-3014 <br />