My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-09-17_REVISION - M1999002
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999002
>
1999-09-17_REVISION - M1999002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:56:46 PM
Creation date
11/21/2007 11:03:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Revision
Doc Date
9/17/1999
Doc Name
TR 1 STORM WATER POND SPILLWAY CALCULATION & DIVERSION DITCH CALCULATIONS
From
AMERICAN SODA LLP
To
DMG
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ATTACHMENT 2 <br />TECHNICAL REVISION -MINING AND RECLAMATION PERMIT <br />YANKEE GULCH SODIUM MINERALS PROJECT <br />AMERICAN SODA, L.L.P. <br />Piceance Site Initial Processing Facility Diversion Ditch <br />The Piceance Site Initial Processing Facility (processing facility) area will be surrounded <br />by a berm system with diversion ditches that will route surface runoff around the <br />facility and into natural drainages. The drainage areas and collection ditches are shown <br />in Figure 3. <br />Following is a summary of the design calculations performed by Kvaerner Metals, Davy <br />Nonferrous Division. <br />Drainage areas around the processing facility <br />Areas 1 (0.62 acre) and R-1 (0.11 acre) flow into Ditch D-1 <br />Area 2 (3.08 acres) flows into Ditch D-2 <br />Area 3 (0.70 acre) flows into Ditch D-3 <br />Areas 4 (1.83 acres) and R-4 (0.13 acre) flow into Ditch D-4 <br />Area 9 (0.90 acre) flows into Culvert C-1 <br />Ditches D-1, D-2, D-3, and D-4 also flow into Culvert C-1 <br />Culvert C-1 flows into an existing natural drainage <br />Areas 5 (0.42 acre) and R-5 (0.14 acre) flow into Ditch D-5 <br />Ditch D-5 flows into Culvert C-2 <br />Area 6 (0.46 acre) flows into Ditch D-6 <br />Ditch D-6 flows into Culvert C-3 <br />Area 7 (1.02 acres) flows into Ditch D-7 <br />Culverts C-2 and C-3 flow into Ditch D-7 <br />Ditch D-7 flows into an existing natural drainage <br />Areas 8 (0.80 acre) and R-8 (0.18 acre) flow into Ditch D-8 <br />Ditch D-8 flows into an existing natural drainage <br />Design storm frequency = 100 years <br />Runoff coefficient, C = 0.50, assumed for undeveloped area surrounding the facility <br />C = 0.95, assumed for outer portion of perimeter access road <br />Roughness coefficient, n = 0.025 (for unlined ditches constructed in area surrounding <br />the facility) and n = 0.026 (for culverts) <br />Summary of Kvaerner Calculations <br />Piceance Site Divernon Ditch System <br />Technical Revision Mining and Reclamation Permit <br />
The URL can be used to link to this page
Your browser does not support the video tag.