Laserfiche WebLink
<br /> <br />• <br />• <br />i <br />LA PLATA No. 1 11~QNE <br />PHASE I and II BOND RELEASE APPLICATION <br />Date of Request: November 30, 1995 <br />Permittee: None (Rocky Mountain Bank and Trust, holder of the reclamation bond <br />is requesting the bond release) <br />Permit Number: C-87-072 (currently revoked) <br />Permit Approval Date: November 20, 1987 <br />Mine Name: La Plata No. 1 Mine <br />Bond Release Phase Requested: Phase I and II <br />Acreaee: Permit Area: 193 acres <br />Disturbed• 7 acres <br />BondinE Company: Rocky Mountain Bank and Trust <br />Bond Tvue: Irrevocable Letter of Credit <br />Bond Number. 1569 <br />Current Bond Amount: $58,200.00 <br />O~nal Bond Amount: $58,200.00 <br />Bond Amount Requested for Release: $47,724.00 (Phase I and II) <br />Leal Description of the Area Requested for Bond Release: W'/~NW'k Section 28, <br />E'fzNE',d Section 29, T35N, R11W, New Mexiw Prime Meridian, La Plata County, <br />Colorado. <br />MaD: The attached maps illustrate the permit and reclaimed areas. Figure 1 in the <br />vegetation report also identifies the azeas sampled for vegetation cover and species <br />composition, as well as the reclaimed azea. <br />Dates of Reclamation Work: Backfilling and grading of the bench and access road <br />occurred in May and June of 1990. During the same time period the sediment pond <br />was reclaimed at the request of the landowner and CDMG, and alternative sediment <br />control was initially constructed. Topsoiling occurred between 1990 and 1991. Final <br />structure removal was delayed due to legal claims regazding ownership of the conveyor <br />structure. Final seeding at the bench and road azea took place in October 1991. Leaga] <br />claims to the conveyor structure were settled and the wnveyor strcuture was removed <br />