My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE25416
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE25416
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:47 PM
Creation date
11/21/2007 11:01:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Enforcement
Doc Date
9/2/1999
Doc Name
NOV CV-9-007 SAMPLE RESULTS ROADSIDE MINE PN C-81-041
From
DMG
To
POWDERHORN COAL CO
Violation No.
CV1999007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11(f!l11IN11111IG <br />999 <br />POWDERHORN <br />COAL COMPANY <br />August 24, 1949 <br />P.O.9oz 7436 <br />Falisatle, C010(ad0 81526 <br />(s7o) as4ass~ <br />Fax (970) 464.7187 <br />u:.:,:., <br />•. <br />:,:..~._ <br />Dan Mathews f ~"~•~~- --»~x,- <br />Division of Minerals & Geology - - <br />2148 Broadway #CS ~ ~ RECFtV p <br />Grand Junction, CO 81503 ~ ~ ~~ ~ ~ '~ <br />t ~ <br />Re: NOV C-49-007 <br />Mine Water Discharge Outfa11004 OI3 Ofi MiH~q,gC~- <br />Permit C-81-041 GRANO Jt1NCtlpt~~'Y <br />Dear 141r. Mathews: -.. -_:... - . ~:"_-~.^x:~..,_ d~•..,. <br />Powderhom Coa! Company (PCC) developed a system to treat the water from the North Portal <br />that worked well until a significant storm event occurred on Wednesday, August 1 t, 1999. The <br />system worked as follows: <br />1. The C Panel 1st North Mains sump collects water from the working section. <br />2. Concurrently water is being retained in the sump at the bottom of the B-Seam No. I North <br />Mains sump. <br />3. Water is staged from the B Seam No. 1 North Mains sump to the mine water sediment <br />pond for further settling and discharge. <br />4. Water is transferred from the C Panel sump to the B Seam sump for about two weeks of <br />settling. <br />The process is repeated about every two weeks. <br />The August l Ith storm event upset the system. The storm event added suspended solids to <br />relatively clean water in the B Seam sump. The situation after the storm event was that al! of the <br />water underground was marginally suitable for discharge. <br />On August 13th the DMG obtained a sample from Outfall 004. A split of the sample was <br />supplied to PCC. Based on the DMG's results of the attafysis {TSS level of 164 mil) a notice of <br />violation was issued to PCC. The steps necessary to abate the violation aze to implement <br />necessary measures to ensure compliance with TSS discharge standard by 5:00 P.M. on August <br />24th. <br />PCC has taken the following steps to ensure compliance with TSS discharge standards. <br />Beginning of August t9th water from the C Pane] sump is being transferred to the B Seam <br />No. 3 North Mains sump. Water is pumped behind the west sea[ and is emerging clear <br />from the east seal. Clear water is then being transferred to the B Seam I st North Mains <br />Sump. <br />
The URL can be used to link to this page
Your browser does not support the video tag.