Laserfiche WebLink
Ci <br /> <br />s <br />1 so long as the operator precedes with due diligent to protect the <br />2 property. <br />3 If the operator does not proceed with due diligent to <br />4 correct the problem, I think all bets are off. Because of that, <br />5 I find that I feel, and I feel strongly in my mind, that despite <br />6 the fact that there is a serious environmental problem out there, <br />7 I am not prepared to issue a notice of violation. <br />8 That is not to say that I don't think Castle Concrete <br />9 has any further obligation with regard to that. I think that <br />10 they have a very strong obligation to work expeditiously and in <br />11 good faith and put forth not just reasonable but their best <br />12 effort and to come up with--not just to try to, but come up with <br />13 a corrective action and to proceed with the rendition of that <br />14 corrective action in an expeditious manner. <br />15 In failure to do so, I would be prepared in sometime in <br />16 the future to reinitiate this process, and I would assure every <br />17 one here in the event we do that--in the event that this Board or <br />18 this one member of this Board does not find or finds that the <br />• 19 Castle Concrete had not exercised its best effort to come up xith <br />20 a corrective plan and to which corrective plan met with the <br />21 satisfaction of this Division, and did not proceed with all <br />• 22 diligence to initiate and to proceed with all diligence to <br />• 23 complete that corrective plan, not only would I be willing to <br />24 reopen or to initiate or to see the initiation of a civil penalty <br />25 in notice of violation proceedings, but I can assure every one <br />