Laserfiche WebLink
(f) Cut slopes shall be reshaped to blend with the natural <br />contour; <br />(g) Cross drains, dikes, and water bars shall be <br />constructed to control erosion; and <br />(h) Road surfaces from which topsoil has been removed <br />shall be covered with topsoil in accordance with <br />4.06.4(2), and the surface shall be revegetated in <br />accordance with 4.15. <br />3~ <br />