~~ <br />7. The shop b ' g was removed and the entire shop/yard area covered with topsoil <br />and reseed .Successful revegetation has been confirmed through field inspection. <br />Rockcastle complied Section II, Part 4 of the Agreement. <br />8. Rockcastle used its discretion for the sequence of reclamation activities specified <br />Section II, Part 5 of the Agreement. Rockcastle has complied with Section II, Part <br />5 of the Agreement. <br />9. Since execution of the Agreement, deadlines for completion of reclamation activities <br />were extended with the concurrence of the Division. Rockcastle completed all <br />required reclamation activities on or before Apri127,1993. Rockcastle has complied <br />with Section II, Part 6 of the Agreement <br />10. The Division received a letter from the landowner (formerly Bogle Farms) on June <br />26, 1990 requesting pit access roads be retained. In conjunction with this request, <br />original access road width was maintained. Rockcastle has complied with Section III, <br />Part 1 of the Agreement. '~ <br />11. Appendix D submitted by Rockcastle to the Division on November 26, <br />demonstrates compliance with Rule 4.052 (Regulations of the Colorado Mined Land <br />Reclamation Boazd for Coal Mining) for Ponds 2 and 3. Rockcastle responded to <br />additional concerns of the Division on May 13, 1992, Rockcastle has complied with <br />Section III, Part 2a of the Agreement. <br />~ qqz <br />12. Rockcastle submitted information to the Division as required to retain p nds 4 and <br />5/6 as permanent impoundments as required by Rule 4.05.9(1). ormation <br />was received by the Division on November 26, 1991 and May 13, 99 . "As built" <br />certifications were received for ponds 4 and S/6 on November 20, 1 Rockcastle <br />has complied with Section III, Part 2b of the Agreement. <br />13. Rockcastle submitted engineering studies to the Division on October 4, 1990 and <br />February 6, 1991 that addressed the stability of Pits 5 and 6. Map R-1 represents <br />final post-muting topography for Pits 5 and 6. Upland diversion ditches for Pits 5 <br />and 6 were eliminated during reclamation work occurring in 1992. No additional <br />reclamation activities were required by the Division after review of these studies. No <br />unstable areas have been identified to date within Pits 5 and 6. Rockcastle has <br />complied with Section IV, Part 1 of the Agreement. <br />14. Rockcastle identified unstable sections on the Pit 4 haul road. Remedial activities, <br />including installation of buttresses and toe drains to .stabilize the Pit 4 haul road, <br />were accomplished in 1992 as required under the approved reclamation plan. Road <br />drainage modifications ~ also completed. Aggregate was imported from offsite to <br />complete these activities. Rockcastle has complied with Section N, Part 2 of the <br />Agreement <br />~~ 2 <br />