Laserfiche WebLink
SUMMARY of NOV C-94-024 <br />9/29/94 Issued for failure to maintain Pond 1, four issues identified. <br />1. Plastic sheeting within primary spillway. <br />2. Outlet of primary spillway overgrown with vegetation. <br />3. Embankment inslope eroded by wave action and burrowed into <br />by aquatic rodent. <br />4. Riprap lining not evident (decomposed) on secondary spillway. <br />Abatement deadline for steps 2 and 3 were extended to the full 90 day <br />timeframe 12 f 28/94. <br />10/28/94 Request for Vacation, DMG received 10f 31/94. <br />12/2/94 Request to Vacate denied by Director. <br />12/21/94 Request for six month extension beyond 90 day timeframe due to weather. <br />12/22/94 Extension beyond 90 days granted by Director for another 90 days. <br />Abatement deadline extended from 12/28/94 to 3/28/95. <br />3/17/95 Modified by Director. Four NOVs were originally issued on 9/29/94, on <br />3/17/95 Director vacated two and modified the remaining two NOVs. <br />3/23/95 Request for extension beyond 90 days due to weather. <br />3/28/95 Extension request granted by Director. Abatement deadline extended from <br />3 f 28/95 to 6/26/95. <br />6/28/95 Date of request letter for extension beyond 90 days due to weather. DMG <br />received request by FAX on 7/10/95, no record of earlier receipt. <br />