Laserfiche WebLink
<br />Battle Mountain Gold <br />Notice of Probable Violation <br />Abatement Requirements <br />(Permit No: M-BB-112) <br />As abatement for the Notice of Probable Violation issued to Battle ~ountain <br />Gold (BMG> on March 31, 1992, the Division imposes the following pe formance <br />requirements. <br />(1) Immediate Increased Tailings Area Security: <br />BMG shall develop and implement a Tailings Area Security progr~m, in <br />order to safe guard the health and safety of the general publi and <br />wildlife. The. plan shall be submitted to the Division as soon as <br />possible for review and approval. In the interim, BMG shall i~plement <br />whatever increased surveillance it deems appropriate to contro the site. <br />(2) Immediate Assessment of Environmental Impact: <br />BMG shall review all available environmental monitoring data c llected to <br />date, including Its approved ground and surface water monitori g sites, <br />air quality monitoring sites, the tailings pile leak detection system, <br />the processing plant circuit, and any other applicable monitor ng <br />facilities. A report summarizing its initial findings shall b submitted <br />to the Division by Friday, April 10th. <br />(3) Accelerated Frequency of Environmental Monitoring: <br />The frequency of monitoring of the environmental monitoring fa ilities <br />referenced in item (2) above shall be accelerated to bi-weekly, <br />commencing immediately and continuing until relaxation is appr ved by the <br />Division. The initial samples shall be submitted to an EPA ce tified <br />laboratory for "rush" analysis. Subsequent samples may be pro essed <br />normally. <br />The results of each set of sample analyses, covered with an ap ropriate <br />brief summary letter report, shall be submitted to the Divisio within <br />three days following completion of the analyses by the laborat ry. <br />(4> Tailings Cyanide Detoxification: <br />BMG shall develop and submit a plan for cyanide detoxification pf the <br />entire slurry and liquid contents of the tailings impoundment as soon as <br />possible for review and approval by the Division. This plan sh 11 be <br />submitted as a technical revision application. This applicatio shall <br />include a schedule for implementation. Following approval of t is <br />technical revision, BMG shall implement the treatment method in <br />accordance with the plan. Appropriate frequency and distribution of <br />monitoring of the tailings and plant circuit shall be proposed within <br />thew application and subsequently conducted to verify the progress and <br />success of the remedial treatment. Monitoring results, covered~by an <br />appropriate cover letter report shall be submitted to the Division weekly <br />during the detoxification program. <br />ri~r~ <br />tiEt <br />~R~Q " I <br />~~,~i'D c11. <br />ule ~~~ <br />u ~ewG~v <br />~t~a , <br />