Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permlttee/ BASIN RESOURCES, INC. Permit C-013-81 Field Visit 02/06rz007 Continuation Pa C <br />Person Number Date g <br />28. <br />3=Not <br />1. _ Mining within Valid Permit <br />2. Mining within Bonded Aree <br />_ <br />3. Terms ~ Conditions of Permit <br />_ <br />4. Liability Insurance <br />_ <br />5. Ownership and Control <br />_ <br />6. Temporary Cessation <br />_ <br />7. AML Rec. Fees -Non-Respondent <br />_ <br />8. _ AML Rec. Fees -Failure to Pay <br />B. Hydrologic Balance <br />1. Drainage Control <br />2. Inspections & Certifications <br />3. Siltation Structures <br />4. Discharge Structures <br />5. Diversions <br />6, Effluent Limits <br />7. Ground Water Monitoring <br />8. Surface Water Monitoring <br />9. Drainage -Acid-Toxic Materials <br />10.i Impoundments <br />I1. Stream Buffer Zones <br />C. Topsoil & Subsoil <br />1. Removal <br />2. Substitute Materials <br />3._ Storage and Protection <br />D. <br />Backfilling & Grading <br />1. Exposed Openings <br />2. Contemporaneous Reclamation <br />3._ Approximate Original Contour <br />4._ Highwall Elimination <br />5. Steep Slopes (includes downslope) <br />6. Handling of Acid & Toxic Materials <br />7. Stabilization (rills and gullies) <br />Excess Spoil Disposal <br />1. Placement <br />2. Drainage Control <br />3. Surface Stabilization <br />4` Inspections & Certifications <br />Coal Mine Waste <br />(Refuse piles/Impoundmentsj <br />1. Drainage Control <br />2. Surface Stabilization <br />3. Placement <br />4. Inspections and Certifications <br />5. Impounding Struchues <br />Use Of Explosives <br />1. Blaster Certification <br />2. Distance Prohibitions <br />3. Bias[ Stnvey/Schedule <br />4,_ Warnings 8c Records <br />5, Comrol of Adverse Effects - <br />E. <br />F. <br />G. <br /> Performance Standard Categories <br /> 30 CFR Counterpart <br />A. AdministraUve .........................„...... ..........................._........... <br />t. Valid Permit .................................................. ..................................773.1 J <br />2, Mining within Bonded Area ................. ...............................773.11 <br />3 . Terms & Conditions of Permit ............... ..............................773.17 <br />4. Liability Insurance ............................................................... 800.60 <br />5. Ownership and Control .......................... ..............................778.13 <br />6. <br />7. Temporary Cessation ............................. <br />AML Rec. Fees -Non-Respondent ...... .842.11(e) & 8161817.131 <br />.........................870,15(b) <br />8. AML Rec. Fees -Failure to Pay ........... ..........................870.15(a) <br />B. Hydrologic Balance ......................................(816/817.41-57) <br />1. Drainage Control .................................... .....................................45 <br />2. Inspections &Certifications ................... ..........................49(ax10) <br />3 . Siltation Structures ................................. .....................................46 <br />4. Discharge Structures ............................. ......................................47 <br />5 . Diversions .............................................. .....................................43 <br />6. Effluent Limits ....................................... .....................................42 <br />7 . Ground WaterMonitoring ..................... .................................41(c) <br />8 . Surface Water Monitoring ..................... .................................41(e) <br />9 . Drainage--Acid -Toxic Ma[erials .......... .................................41(t) <br />10 . Impoundments ....................................... .....................................49 <br />11 . Stream Buffer Zones .............................. .....................................57 <br />C. Topsoil &Subsoil .............................. .................(816/817.22) <br />1. Removal ................................................. .................................22(a) <br />2. Substitute Materials ................................ .................................22(e) <br />3. Storage end Protection ............................ .................................22(c) <br />4. Redistribution ......................................... .................................ZZ(d) <br />3) <br />E. Excess Spoil Disposal„...„ ..........................._ .......(816/817.71-74) <br />]. Placement .............................................................. ............................71(e) <br />2. Dreinege Connol ................................................... .............................71(f) <br />3. Surface Stabtltzation .............................................. .............................71(8) <br />4. Inspections &Certifications ................................... ............................71(h) <br />F. Coal Mine Waste (Retnse Pltes/Impouodments) ,,,,,(816/817.81-84) <br />1. Drainage Control ................................................... ............................83(a) <br />2. Surface Stabilization .............................................. ............................83(b) <br />3. Placement ............................................................... ............................83(c) <br />4. Inspections and Cettifications ................................ ...........................83(d) <br />5. Impounding Strut[ures ........................................... ................................84 <br />G. <br />1. <br />2. <br />3. <br />4. <br />5. <br />H. <br />I. <br />2. <br />3. <br />4. <br />5. <br />J. <br />1. <br />2. <br />D. Backfitfing & Grading ..............................(876/817.95207) IC. <br />1. Exposed Openings ...............:.....6161817.13, 14, 15, &.823.11 & 21 ~ <br />2. Contemporaneous Reclama[Ion ......................... .........................100 <br />3. Approximate0riginalContour .......................... ................102(a)(1) I~ <br />2 <br />4. Highwall Elimination ......................................... . <br />................102(a)(2) <br />5. Steep Slopes (includes downslope) .................... ........................107 M, <br />6. Handling of Acid & Toxic Materials ................. .....................102(c) <br />~ n...u: r.-..:..„ I.IIIc o.,A oiJliesl..._ ...................... .......................95(b) <br />Use of Explosives-..„....„ .................................. _...(816/817.61-68) <br />Blaster Certitcation ................................................... ........................til(t) <br />Distance Prohibitions ................................................. ........................61(d) <br />Blast Survey/Schedule ............................................... ........................62-64 <br />Warnings & Records ................................................. .....................66 & 68 <br />ConUol of Adverse Effects ........................................ .............................67 <br />Subsidence Control Plan .........................................(817.121-122) <br />Roads ................................................................ .(816/817.] 50-] 51) <br />Road Construction ..................................................... ......................I50(c) <br />Certification ............................................................... .......................I51(a) <br />Drainase ..................................................................... ..........I50(b -151(d)) <br />3 <br />Surfacing and Maintenance ........................................ ..........I50(e <br />-I51(d) <br />Reclamation ............................................................... ....................... 150(f) <br />Signs&Markers ............................................. ..........(816/877.11} <br />Signs .......................................................................... ........... l I (a),(b),d:(c) <br />Markers ...................................................................... 1 l (a),(b),(d),(e),~(fl <br />Distance Prohibitions .......................................................(761.] ]) <br />Revegetation ..................................................... (816/817.111-116) <br />Vegetative Cover ....................................................... ................111 & 116 <br />Timing ........................................................................ .......................... l 13 <br />Postmining Land Use ..............................................(816/817.133) <br />Revi¢d Dttemh~ 9. 1991 Page 2 of <br />~~gories <br />E sewhere, 6=Previously Cited <br />H. 2 Subsidence Control Plsn <br />I. Roads <br />1. Road Construction <br />2. Certification <br />3. Drainage <br />4. Surfacing and Maintenance <br />5. Reclamation <br />J. Signs & Markers <br />1., Signs <br />2. Mazkers <br />K. _DistanceProhibitions <br />L. Revegetation <br />I. Vegetative Cover <br />2._ Timing <br />M. _Postmining Land Use <br />N. Other <br />Genera! <br />Performance <br />Category <br />A 2 <br />aailusa to companeaia the <br />_ _ 2) <br />