Laserfiche WebLink
~~~`"„'~, U. S. DEPT. OF THE INTERIOR <br />"' ~"~' OFFICE OF SURFACE MINING <br />YI <br />Mine Site Evaluation ~~; y <br />RECEIVED State Program ~: s, ~,~; <br />1. Permittee/Person Q~~ 9. Permit Number 10. Permit Type <br /> BASIN RESOURCES, IN aclamation• C-O13-8] pp <br /> 2. Address ~ ~n1ng and 1 ]. Field Visit Date 12. Purpose 13. SRA Present <br /> 34115 COUNTY ROAD 20.8 02/06/2007 CC N^ <br />3. City q, State mm - dd • yyyy <br /> <br />Trinidad CO 14. Permit Status 15.~ Status 16.. <br />Facil <br />e <br />' B <br />~ <br />Code 6. Phone Ntnnber <br />5. Z <br /> 17. OSM Office # 18. CCID # 19. Land Code <br />81082 (719) 846-2427 <br />140 0007-]40-00] SF <br />7. Operator Name, if Different than Permittee <br /> 20. M,S.H.A ID # 21. Stat e Abrev. 22, County Name <br /> OS <br />83 LAS <br /> -02 <br />8 CO t~ l <br />Mine Name <br />8 <br /> . <br /> 23. AVS Permittee Entity Ib Number 24, State Office <br />GOLDEN EAGLE MINE <br /> 056887 <br />25. Hours 26. 'nature Block 27. Rtviewi <br />Official: <br />~ <br />8.0 a Permit Review ~ ^ ~ <br />1~ <br />(f(r ~~J({ ( <br /> <br /> <br />0 <br />0 <br />b. Site Visit Time S' e: zIVI~7 Sigttature: <br /> . HENRY AUSTIN ID # 116 <br />0.0 a Travel Time printed Name: Review Date: Z / (p / Zt1if 7 . <br /> <br />2,p d. Report Writing <br />Date; 02/06/2007 mm - dd - yyyy <br />Is Supplemental MSE Page Used YrN Y^ <br />Permtt Type -Item 10 IP =Interim Program, PP = PertnaneM Program , NP = No Pemmtt <br />Purpose Type codes Item 72 CCR.._Citizen Complaint Referral (non site vistt) <br />Oxx.,. Oversight RFx... Rectama0on Fees CC...... Cttizen Complaint (inttial site visit) <br />A7a.... Assistance Fxx..... Fetleral Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspec0on - ttem 19 A joint inspection Is when a state inspector accompanies an OSM inspector any time during Ne review d the mina stte. <br />Parmtt Status -Item 14 AB....Abandonetl: All surface and underground coal mining activities have ceased and <br />operetor has left the site without completing reclamation as defined in <br />A.... Active: Coal mining aril reclamation activities occurring or 30 CFR 840.1 t (g) <br />ppermitted but not yet disturbed. A61.. Bond Forfeiture: Bond fodetture officially in process or completed, and. <br />IN....Inedive (Permanent Program Permtt): Phase II completed or ~ reclamation in progress or not yet commenced. <br />Temporary Cessation of peretiens. (Interim Progrem Partntt) ABZ..Partialty Reclaimed Forfeiture: Fodeited site where all bonds have been <br />Coal mining completed and reclamation activities initiatetl. used to reclaim site, but site nd reclaimed to Program standards. <br />BR...Bond Release: Reclamation completed and State Regulatory A83.. Reclaimed Forfetture: Forteitad site that has been reclaimed to Program standards <br />Authorfly (RA) has releasatl all of the bond (Phase III Release.) NA...NOt Applicable: When she is unpermiltetl. <br />Site Status Codes -Item 16 N5.. Non-Site Visit: Status of site not determined <br />ND.. No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining adivtty on site, FP.. Forfehure Pending The RA is pursuing <br />operations have been started. site regraded and awaiting pphose bond release. actions to revoke the permtt, coiled the <br />EX..Coal Exploration: Coal exploration operations <br />t TC.. Temporary Cessation: The RA has granted <br />ti <br />f <br />30 CFR Bt <br />i <br />t t <br />1 performance bontl(sj, and/or reclame- <br />ions <br />have started and where coal mining opera ng pursuan <br />o <br />cessa <br />on o <br />min <br />6 lion of forfeited site is in progress. <br />have not begun. <br />i <br />C <br />l <br />rf <br />i <br />i 817.137(b). <br />P1 <br />Ph <br />I RR <br />l <br />At l <br />t Ph <br />I b <br />d <br />l FR..Forfeited and Reclaimed: Forfetture <br />oa <br />su <br />ace m <br />n <br />ng <br />AP.. Active Coal Produc <br />ng: ase <br />e <br />ease: <br />eas <br />ase <br />on <br />re <br />... <br />ease reclamation completed. <br />activttiea are occuring. granted for entire permitted area. For interim FO..Abandoned Site: Abandoned site that <br />qN,. Active Non-Producing: Active non-protlucing permits, partial bond release, is permitted but there is rto bond. <br />facility such as tipple or pre oration plant; <br />i <br />ti <br />t P2.. Phase II Release: At least Phase II bond release WC.Wddcat: Coal mining and ieclamation <br />i <br />f <br />th <br />ti <br />d <br />s ac <br />ve, si <br />e is <br />NM..No Mining: The Permit Status or <br />area. <br />e en <br />re perm <br />tte operations have or are taking place and <br />not in Temporary Cessation, no surface coal P3.. Phase 111 Ratease_ Reclamation wmpleted and the activity is not covered by.tha <br />I Facility Typa Cotles -Item 7s D...Anciltary (Hauiroad, Conveyor, and/or Rails) H...Exptoration Permits L... Ramining site ppermitted <br />A... Surface E... Refuse andlor Impoundment I... Notice of Intent to Explore under 30 CFR7t15?5 <br />8... Underground F... Loadingg Facility andlor Tipple J... Exempt t6 and Z3 <br />C... Preparation Plant G...Stockples K...Government financed Construction Exemption <br />Small Business Regnlatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from <br />small businesses about Federal agency enforcement actions. The Ombudsmen will annually evaluate the enforcement activities and rate each a enc 's <br />•_._____._ __..n ~....:.._... rs,,,.,, ,,., , ~m,u ti„ccoecs ra husinesx with 500 or fewer emolovees includine those of affiliates) poop 1 of <br />