Laserfiche WebLink
Protect Itlantlgcatlon <br />Demolition work <br />Agency or organiratlon name: <br />Task #: 44A <br />Data: 9/62007 <br />User: TAK bite: Wes( E!k Mine <br />PertniRing action: MR-344 <br />Task tlescription: Remove, loaq haul, tlispose 1400" 018" HOPE in Syl Gulch Rtl extension <br />Page 1 d 1 <br />Cdoretlo Division or Redamanon, Mining end Se/ety <br />Pannlt/Job#: C-64007 <br />AbbrevlaROn: N/A <br />Filename: <br />Source of unit costs: CIRCES <br />Lxatlon atlJusvnenc 92.32% <br />Last unit Lost uptlate: 7/1/2006 <br />STRUCTURE or ITEM DESCRIPTION QUANTITY UNIT CIRCES DEMOLITION MENU SELECTION JIT COST TOTAL COST <br />ft fl R I( in <br />Remove 1400' of 8"-diametre HDPE In Syl. G. exension rd. 7400 1,400 LF Pipe, CMP - 8 in. diem. $4.5500 $6,370.00 <br />Load and haul 1400' of 8"-diameter HDPE tl Syl. G. extension b. 92 CV Loading and 2 mile haul, no salvage - Machine tootling $11.4200 $1,050.64 <br />Dispose HOPE 92 CY Dumpfees-Building oonsWdion materials. $75.5600 $6,951.52 <br />Location adjustment: 92.32% <br />Total fof this page befofe location adjustmem $14,372.16 <br />Total for this page after location atljusiment $13,268.36 <br />