My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV14413
DRMS
>
Back File Migration
>
Revision
>
REV14413
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:25:36 AM
Creation date
11/21/2007 10:52:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
9/6/2007
Doc Name
Reclamation Cost Estimate
From
DRMS
To
File
Type & Sequence
MR344
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br />File name: westelkcestsummary.zls <br />Colorado Division of Reclamation, Mining and Safety <br />~,yr: • Reclamation Cost Summary <br />~ch.:a <br />Permit No. C-80-007 Prepared by: TK Date: 9/6/2007 <br />Mine name: West EIk Permit orjob action; MR-344 County: Gunnison <br />TASK LIST (DIRECT COSTS) <br />Task no. Task description Fonn Fleet <br />Used Size Task <br />Hours Direct Cost <br />44a Demolish 1400' of 8"-diameter HDPE in Syl. G. Rd. extension tlemo 1 12.00 $ 13,268 <br /> GRAND TOTAL -DIRECT COSTS 12.00 $ 13,268 <br />Intlirect Costs <br />Contractor's overheatl & profit <br />Liability insurance: 2.02% %of direct costs total = $ 268 <br />Pertonnance bond: 1.05% % of direct vests total = $ 139 <br />Job superintendent: s.co hrs. at $ 39.38 per hour total = $ 236 <br />Profit: 10.00% %of tlirect costs total= $ 1,327 <br /> TOTAL O & P= $ 1,970 <br /> CONTRACT AMOUNT (direct + O & P)= $ 15,238 <br />DMG project management <br />Financial warranty processing (legal/rela[etl costs): NA <br />Engineering work and/or bid preparation: 4.25% %of contract $ 648 <br />ReGamation management and/or administration: 3.25% % of contract $ 495 <br />Contingency NA %of direct costs <br /> Total indirect reclamation costs $ 3,113 <br />Total performance bond a mount (tlirect vests plus indirect costs) $ 16,381 <br />
The URL can be used to link to this page
Your browser does not support the video tag.