Laserfiche WebLink
incumbent on BMR2, nor do I think the MLR Board intended or BMRI, to <br />bear the burden of discovering how to solve any analytical methods <br />problems. <br />I recommend that the Division accept BMRI's proposal without revision. <br />Upon receipt and approval of the sampling results from the nth sampling <br />event, receipt and approval of the 5th trip report, and receipt and <br />approval of a final report, the third party monitoring pr gram should <br />be considered complete and the MOU between the Division an BMRI would <br />dissolve. <br />I am prepared to write a report for the Board emph sizing the <br />difficulties the Division had with the third-party monitor ng program; <br />not with the operatives but with the program itself. If y u want such <br />a report, please let me know. <br />I would like to see this program completed by about the end of November <br />(that is the earliest we can expect given the lab turnaroun time). If <br />you have any comments on the BMRI proposal, please let me know. <br />cc: Larry Oehler <br />Jim Pendleton <br />Jim Stevens <br />M:\MIN\HHP\BMRI.MEM <br />