Laserfiche WebLink
,~ <br />Sun Coal Company <br />10200 West 44th Ave., Ste 120 <br />Wheat Ridge, CO 80033 <br />(303) 422-8064 <br />FAX (303) 467-0714 <br />June 7, 1994 <br />Ms. Susan Burgmaier <br />Colorado Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />~~I ~I~~I~~I~~~~~ ~I~ <br />sss <br />RECE~U~p <br />JUN 8 1994 <br />Divi.ion ct r.^u~ery~s ~ Gec;cnY <br />Re: NOV C-94-011 issued to Meadows N 1 Mine for failure to conduct rill and gully surveys <br />(file C-81-029) <br />Dear Ms. Burgmaier: <br />Sun Coal Company is providing the required remedial actions to abate CDMG NOV C-94-011 <br />with this transmittal. Attached is the June 1994 rill and gully survey inspection report and <br />remediation plans required to abate NOV C-94-011. Please note that the rill and gully survey <br />was conducted on June 1, 1994 within two days of Sun Coal's receipt of the Notice of <br />Violation and in the shortest time possible to abate the violation. Additionally, Sun Coal took <br />extraordinary measures in securing the services of a professional engineer, a reclamation <br />specialist, and the agent for mine maintenance to conduct the rill and gully survey and plan <br />and implement remedial measures. <br />Sun Coal believes this submittal abates Notice of Violation C-94-011, and requests immediate <br />issuance of a Termination Notice by the Division. <br />Sincerely, <br />ryan .Archer <br />Mine Manager <br />attachment: June 1994 Meadows N 1 Rill and Gully Survey <br />cc: Michael S. Savage, Savage and Savage, [nc. <br />