<br />limestone in area 10. This phase is expected to require 4 years. The total area <br />worked is expected [o be 32 acres. <br />Phase V Limestone will be removed from Areas 7 and 8. This is expected [o require 2 <br />years. The total area worked a[ [his time is expected [o be 16 acres. <br />Phase VI Reclamation will be completed during this phase. The sandstone overburden will <br />be pushed back into the excavation left by [he limestone leveled and contoured <br />to a slope oC less than 2 [0 1. The topsoil will be leveled over [he sa. dstone ro a <br />depth of 8" [0 12". The area will be seeded with a mixture of Indian ricegrass <br />Wheat grass, Mountain mahogany and Rabbit brush, to be hand broadcast a[ 18 <br />Ibs per acre, in the spring. This will be accomplished within 5 years of <br />completion of mining. <br />