My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV14169
DRMS
>
Back File Migration
>
Revision
>
REV14169
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:25:20 AM
Creation date
11/21/2007 10:49:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977301
IBM Index Class Name
Revision
Doc Date
3/30/1998
Doc Name
TR ROBERTS QUARRY PN 77-301
From
COLORADO LIEN CO
To
DMG
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />MINING PLAN <br />Phase I Area 1, 2 and 9 will be stripped. The topsoil from the lower area will be <br />removed first and stockpiled in Area A. The topsoil will be preserved and <br />vegetated with Annual rye and Indian ricegrass. The sandstone over burden will <br />be drilled and shot. It will [hen be stripped and piled in front of Area A. Area C <br />will be stripped of topsoil which will be stockpiled in Area A. This area will be <br />used for crushing and stockpiling. Limestone will be removed from :area ]and W <br />1/4 of area 10. This phase is expected to require 2 years. The total area worked <br />will he approximately 15 acres. <br />Phase II Area 3, 4 and 8 will be s[ripped,(.the topsoil removed, stockpiled, preserved and <br />vege[ared in area A. The sandstone will be stripped and piled in front of A. <br />Limestone will be removed from area 2, 9 and remaining W 1/2 0( area 10. This <br />phase will require approximately 3 years. The area worked at this [irne will be <br />approximately 23 acres. <br />Phase III Area 5 and 6 will be stripped. The topsoil will be removed, stockpiled, preserved <br />and vegetated in area A. The sandstone will be stripped and piled io front of A. <br />Limestone will be removed Crom areas 3, 4 and the E 1/2 of the W 1./2 of area <br />10. This phase is expected ro require approximately 3 years. The area worked at ~ <br />[hi a time will be approximately 35 acres. Area 9 will be reclaimed. 'i'he <br />sandstone overburden will be backfilled into [he excavation left by extraction of <br />the limestone leveled and contoured. The topsoil from area A will be spread over <br />the sandstone at a depth of 6" to 12". Seeding will be done with a mixture of i <br />Indian ricegrass and Annual rye. I <br />Phase IV Arca 7 will be stripped. The topsoil will be removed, stockpiled, preserved and <br />vegetated in Area A. The sandstone overburden will be stripped and stockpiled in <br />front of area A. Limestone will be removed from Area 5, 6 and [he .remaining <br />
The URL can be used to link to this page
Your browser does not support the video tag.