Laserfiche WebLink
<br />MDI will replace topsoil to a depth of 6 to 8 inches on any affected area that will be <br />reclaimed. <br />6. Please provide dimensions of all areas of the site to be reclaimed and provide <br />a topsoil balance to indicate if the volume currently stockpiled on site is enough <br />to replace the minimum 6 inch depth over these areas. If a shortage is indicated, <br />please indicate how MDI will make up for the shortage. <br />The approximate volume of the three topsoil stockpiles is 10,800 ft'. The following <br />areas will be reclaimed to a depth of 6 to 8 inches: <br />1. Two ore storage areas, approximately 20 feet in diameter. <br />2. Diversion ditches, approximately 300 feet in length and 10 feet wide. <br />3. Area around mill, approximately 50 feet by 100 feet. <br />4. 65 level adit, approximately 20 feet by 20 feet. <br />The total volume of topsoil necessary to reclaim the above areas 6 to 8 inches is about <br />4518 ft3. As you can see there is enough topsoil to cover the reclaimed areas to the <br />required minimum depth with plenty to spare. <br />Exhibit E <br />Mans <br />1. Please revise the application maps to indicate the draining 175 level adit, the <br />pre-existing mine shaft that is located below and across Gaines's Gulch from the <br />175 level adit, and any other structures within the permit boundary or within 200 <br />feet of the permit boundary. <br />The revised application maps are included. <br />2. Please indicate, on the mine plan map, the location of the water monitoring <br />points of compliance with their respective labels, so that the sites can be easily <br />identified. <br />Groundwater points of compliance have been included on the mine plan map. <br />