Laserfiche WebLink
<br />ROBINSON BRICK COMPANY <br />Estimated Reclamation Costs at Hogback Date: August 17, 2001 <br /> <br />Item Units Rate Unit Total Costs <br /> <br />8ackfll & Grade 330,000.0 0.39 $/yd 128,700 <br />Replace Topsoil (56.56 acres max) 45,625.0 0.49 $/yd 22,356 <br />Reseed (56.56 acres max) 56.6 391.18 $/acre 22,125 <br />Rip Roads 2.5 200.00 $/acre 500 <br />Labor 13,000 <br />Misc. (Widlife pathways etc.) 10,000 <br />Mob/Demob 2,500 <br />Subtotal 199,181 <br />Profit and Overhead (13.1%) 13.10 % 26,093 <br />Subtotal 225,274 <br />DMG Fee 5.00 % 11,264 <br /> <br />TOTAL BOND $236,538 <br />