Laserfiche WebLink
problems will be evaluated. Corrective actions will be taken for the mitigation of any stormwater <br />discharge. Deficiencies as they relate to the stormwater management plan will be fidly <br />documented. <br />The semi-annual comprehensive inspections will need to be summarized and reported in an <br />Annual Report to CDPHE. <br />4.3.10. Recordkeeping and Reporting <br />The Owner will submit a report on the compliance with the stormwater management plan. The <br />report will contain: <br />• Name of permit holder, address, phone number and permit certification number, <br />• A report on overall compliance with the SWMP, and <br />• Summaries or copies of past biannual inspection reports. <br />All reports required for submittal shall be signed and certified for accuracy by the mine manager <br />or other qualified employee- <br />J: U9irresLSWMP1Eulo-Xingslr+vmp rev II-99 15 <br />November 1, 1999 <br />