My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-06-03_REVISION - M2001107
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001107
>
2002-06-03_REVISION - M2001107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:56:45 PM
Creation date
11/21/2007 10:47:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001107
IBM Index Class Name
Revision
Doc Date
6/3/2002
Doc Name
Technical Revision to the Approved Application
From
RC Rollin Consulting
To
DMG
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Report Terracon <br />Rollin Consulting <br />Terracon Project No. 21025057 <br />Other construction requirements outlined by the Division of Minerals and Geology should be <br />followed. <br />GENERAL COMMENTS <br />Terracon should be retained to review the final design plans and specifications so <br />comments can be made regarding interpretation and implementation of our geotechnical <br />recommendations in the design and specifications. Terracon also should be retained to <br />provide testing and observation during excavation, grading, and construction phases of the <br />project. <br />The analysis and recommendations presented in this report are based upon the data <br />obtained from the borings performed at the indicated locations and from other information <br />discussed in this report. This report does not reflect variations that may occur between <br />borings, across the site, or due to the modifying effects of weather. The nature and extent <br />of such variations may not become evident until during or after construction. If variations <br />appear, we should be notified so that further evaluation and supplemental recommendations <br />can be provided. <br />', The scope of services for this project does not include, either specifically or by implication, <br />any environmental assessment of the site or identification of contaminated or hazardous <br />' materials or conditions. If the owner is concerned about the potential for such <br />contamination, other studies should be undertaken. <br />' This report has been prepared for the exclusive use of our client for specific application to <br />the project discussed and has been prepared in accordance with generally accepted <br />geotechnical engineering practices. No warranties, either express or implied, are intended <br />' or made. Site safety, excavation support, and dewatering requirements are the <br />responsibility of others. In the event that changes in the nature, design, or location of the <br />' project as outlined in this report, are planned, the conclusions and recommendations <br />contained in this report shall not be considered valid unless Terracon reviews the changes, <br />and either verifies or modifies the conclusions of this report in writing. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.