Laserfiche WebLink
~~ <br />PAGE 2 <br />APRIL 13, 1993 <br />JANET BINNS <br />4. The 8-1/2" x 11"drawings (page 42-1 and page 42-2 of Illustration 42) submitted <br />earlier were reduced from larger drawings. Only line scales should be used. Page <br />42-1 will be deleted since this information is provided in the new Map 143. Page <br />42-2 has been revised. <br />5. I understand the Division will check on the adequacy of the riprap size on the <br />slope below the primary discharge pipe. <br />6. Six-inch riprap have been provided for inlet protection of the pond. See revised <br />Map 141. <br />7. Page 42-12 of Illustration 42 (a new page) shows details (length, slope, etc.) of <br />the culvert to be installed under the SDHH4 access. <br />Three copies of the following documents are enclosed to be inserted or replaced in the permit <br />document. <br />Map 141 (revised) <br />Map 144 (new) <br />Page 42-1 (blank) <br />Page 42-2 <br />Page 42-12 <br />If you have any questions, please call. <br />Sincerely, <br />Murari P. Shrestha, P.E. <br />Assistant Manager of Engineering <br />MS:Igp <br />ce: Raja Upadhyay <br />Tim Chervick w/2 copies <br />BLM -Craig <br />BLM -Meeker <br />OSM -Albuquerque <br />OSM -Denver <br />Town of Rangely for public display <br />