Laserfiche WebLink
C-84-065 MR 16 <br />C:\WPDOCS\CoalRidge\MR16Compliance Review65.doc <br />Page 2 of 4 <br />second for compliance for a proposed decision. Rules that apply for completeness are indicated <br />with an asterisk (*) and include: 1.04(73), 2.07.3(1), 2.08.4(3), 2.08.4(5), 2.08.4(5)(a), <br />2.08.4(5)(b), 2.08.4(5)(c), and 2.08.4(5)(d). <br />With regazd [o compliance for a proposed decision, noted is [hat the study was submitted to be <br />included in the PAP, no[ in support of an application for a Phase II Bond Release. However, in <br />anticipation of the study being used in support of future bond release applications, it was <br />reviewed for adequacy as such. <br />*Rule 1.04(73) "Minor revision" means n modijrcatiorr in permit provisions to reflect minor <br />alterations in the location of roads or other facilities within the permit area, mirror alterations in <br />the timing or sequencing ajmining or reclantatiort plans approved in accordance wid: the <br />requirements of these Rules or other minor alterations in surface coal mining and reclamation <br />operations which shall not cattse a sigrtificnrtt alteration in the pennittee's reclarnatiort plan. <br />The application is appropriate to this rule as the requested change is a minor alterations in surface <br />coal mining and reclamation operations which shall not cause a significant alteration in the <br />permittee's reclamation plan. <br />*Rule 2.07.3(1): Upon submission of an application far permit or revision or renewal thereof, <br />the Division shall, within 10 days of receipt of salt/ application, review the submission artd <br />determine if it is corrtplete.t /f the npplicatiort is complete, the applicant shell be duly notified <br />and the application shall be considered filed for purposes of the ActZ. /f the application is <br />incomplete, notice to that effect shall be rrtailed to the applicant within said /0-day period, and <br />the applicant shall be given the opportttrtity to nrrtend, review, or otherwise make said <br />application complete. <br />' The Application was found complete on March 23, 2001. See Rule 2.08.4(5)(a), (b) and (c) <br />below for the criteria for this determination. <br />'" Not applicable to a determination of completeness. <br />*Rule 2.08.4(3) See the Rules for the text of this rule. <br />The proposed action was determined to be appropriate to a minor revision [Rule 1.04(73)]. <br />*Rule 2.08.4(5) Application requirements. An application for all types ojrevisions or a penrtit <br />shall contain: <br />*Rule 2.08.4(5)(a) An identiftcotion of the penrtit by penrtit rturnber or other appropriate rejerertce <br />which is the subject of the revision; <br />