My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_ENFORCEMENT - M1978352 (13)
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M1978352
>
_ENFORCEMENT - M1978352 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2022 2:33:33 PM
Creation date
11/21/2007 10:41:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978352
IBM Index Class Name
Enforcement
Doc Name
APPENDIX TO MEMORANDUM BRIEF IN SUPPORT OF DEFENDANTS MOTION TO DISMISS OR IN ALTERNATIVE FOR SUMMAR
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
than one hundred d•ars or more than one thousand •lars . A fraction of an <br /> acre shall be considered a full acre for the purpose of computing the fee. <br /> In addition, a supplemental surety, as determined by the P.oard, for any <br /> additional acreage shall be submitted. If the area of the original applica- <br /> tion is reduced , the amount of the surety , as determined by the Board , shall <br /> proportionately be reduced. Applications for amendment of a permit shall be <br /> reviewed by the board in the same manner as applications for new permits. <br /> 1 .9 Technical Revision <br /> Technical revisions to permits are acceptable. A technical revision is <br /> defined as : A CHALICE IN THE PERMIT UHICH DOES NOT HAVE, it) THE JUDf,MFNT <br /> OF THE BOARD; MORE THAN A MINOR EFFECT ON RECLAMATION. The total disturbance <br /> for technical revisions shall not exceed the amount .of area bonded for that <br /> disturbance. <br /> Prior to implementation of any proposed revision , technical revisions must <br /> be submitted in writino to the Division. The Division will place that <br /> request on the agenda of the next regular Board meeting. The Board , in its <br /> discretion , shall determine if an amendment must be filed. <br /> To avoid the necessity of frequent technical revisions , operators are urged <br /> in the submission of their application , to allow flexibility in the <br /> methodology of the mining operation such as , but not limited to: <br /> (a) Designating corridors for transportation and utilities and/or citings <br /> for facilities and buildings ; <br /> (b) Describing the equipment as generally appropriate for the function <br /> rather than mentioning specific equipment : and <br /> (c) Giving ranges of anticipated depth of topsoil removal and replacement. <br /> ®109 1 . 10 Conversions <br /> 1 . 101 Definitions <br /> A conversion is an application for a 1976 permit which is filed by <br /> an operator with : <br /> (a) A 1973 Act permit any time after July I . 1976, but prior <br /> to ninety (90) days before the expiration of the 1973 Act permit : or <br /> (b) A 1976 Act Rule 3 permit which he has held for at least two <br /> consecutive years, and who wishes to expand the operation <br /> 1 . 102 Conversion Fees <br /> There will be a basic fee of $50, plus : <br /> $15.00 per acre for the first 50 acres : <br /> $10.00 per acre for the second 50 acres - and <br /> S 5.00 per acre for the third 59 acres , <br /> up to a maximum of: <br /> - Il - <br />
The URL can be used to link to this page
Your browser does not support the video tag.