Laserfiche WebLink
Public Liability Insurance $678 <br />Bond $426 <br />Contractor's Profit $4373 <br />Job Superintendent $4572 <br />The indirect cost equals $10,049. The Division's cost for contract preparation <br />fees and management equals $3786, resulting in a total bond of $57,563 or <br />$57,600. <br />The next component of the revision addresses the removal of the shrubs from <br />the revegetation success criteria. The current application of the pastureland <br />land use definition does not envision the establishment of shrubs. The <br />definition is as follows: °Pastureland° means land which is used for the <br />production of adapted, domesticated forage plants for livestock grazing or <br />occasional hay production. Pastureland maintenance entails cultural inputs <br />such as seeding, irrigation, fertilization, brush control and pest control. Land <br />used for facilities in support of pastureland is also included. As is called out in <br />the definition maintenance of pastureland includes brush control. Therefore, it <br />is CYCC's position that the shrub requirement is not appropriate at this time. <br />The appropriate pages are modified to reflect the above changes, and can be <br />inserted into the permit. <br />In the interim, if there are questions please give me a call <br />Sincerely, <br />~~~/ j~~ <br />Richard Mills <br />Environmental Manager <br />file;I: \document \cycc \m3 \tr9708c1.doc <br />