My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-07-11_REVISION - M1994080
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994080
>
2006-07-11_REVISION - M1994080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:39 AM
Creation date
11/21/2007 10:41:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994080
IBM Index Class Name
Revision
Doc Date
7/11/2006
Doc Name
Financial Warranty Increase
From
DMG
To
Arkins Parks Stone Corp.
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Task # : 001 <br />Date : 07/11/2006 <br />User: ESC <br />Agency or organization name :DMG <br />Permit or other job action :Reevaluate Amount of Required Bond <br />Task descdption : Bact~ll & Grade Waste Piles Into Pit to Achieve 3h:1 v <br />HOURLY EQUIPMENT COST <br />County :Lorimer <br />Site :Berthoud Sunset <br />Basic machine :Cat D8R Series 11- 8SU Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 :BOPS Cab Shift basis : 1 per day <br />Attachment no. 2 :1-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $54.80 NA <br /> Operating cosUhour : $75.29 100 <br /> Ripper op. cosUhour : $2.03 20 <br /> Operator cost/hour : $32.53 NA <br /> Total unit cosUhour : $164.65 Total fleet cosUhour : x329.30 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 15,000 LCY factor : NA volume : 15,000 LCY <br />Source of estimated volume :DMG Estimate <br />Soume of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 150 feet <br />Unadjusted hourly production : 634.3 _LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 10.00 % ({ <br />Average site altitude : 6,000 feet <br />Material weight : 3,300 Ibs/LCY <br />Weight description <br />Decomposed rock - 75% Rock, 25% Earth <br />Operator skill : 0.75 <br />Matedal consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 0.79 <br />Altitude : 1.00 <br />Material weight : 0.70 <br />Blade type : 1.00 <br />Net correction : 0.27 <br />Adjusted unit production : 173.15 LCY/hr <br />Adjusted Fleet production : 348.31 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 2 Dozers) Total job time : 43.31 Hours <br />Unit cost : $0.951 /LCY Total job cost : x14,263 <br />State :Colorado <br />Permitfjob# : M-1994080 <br />Abbreviation :none <br />Filename :M080.001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.