:~ <br />The current plant flow is approximately 14, 000 gpm. Once the temporary column skid is <br />placed, a connection will be made between the head column and the primary steel header feeding <br />the existing ADR columns. The connection will be equipped with an automatic value that will <br />be wired into the ADR PLC system and approximately 500 gpm of pregnant solution will be <br />directed into this new set of columns (maximum flow through these columns is 700gpm). <br />According, total flow of pregnant solution processed will increase from approximately 14,000 <br />gpm to approximately 14,500 gpm (still well below the 17,000 gpm maximum ADR flow <br />modeled in the water balance -TR45). <br />Once solution is processed through the skid-mounted tanks, the solution will be (1) routed <br />directly to the barren tank at the reaz of the ADR for general redistribution to the pad or (2) <br />routed sepazately from the skid -mounted barren tank to the Phase 1 leach azea for direct drip <br />application to the Phase 1 ore. The barren tank at the tail end of the skip will also be fitted with <br />an HDPE overflow pipe to assure that any excess solution is routed the pipe channel well within <br />the Phase 1 heap leach azea. <br />The five columns and the barren tank represent approximately 3,500 cubic feet of steel structure, <br />the steel framing and platform and steps represent an additional 1,000 cubic feet of salvageable <br />steel. Using $0.27 per cubic foot for salvage, cut up and removal of the skid will be $1,215. It i~ <br />estimated that approximately four semi trips to Pueblo will be required to remove the scrapped <br />steel to the salvage yazd. At approximately $550 per trip, transportation costs will be <br />approximately $2,200. Adding the 22.5% state administrative costs, the proposed financial <br />warranty for this technical revision is $4,184. The current unallocated bond with DRMS is <br />$62,748. Please add this TR-50 bond estimate of 4,184 to committed bond, leaving <br />approximately $58,568 in unallocated bond. <br />A check in the amount of $1006.00 for this technical revision request is attached. <br />Please contact me at (719)-689-4056 should you have questions or wish to discuss this request <br />for technical revision. <br />Environmental Resources <br />xc: Paul Clarkson <br />Director, Teller County Planning Department <br />Enclosed attachments <br />