My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV13339
DRMS
>
Back File Migration
>
Revision
>
REV13339
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:24:22 AM
Creation date
11/21/2007 10:41:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/2/2007
Doc Name
Submittal
From
CC & V
To
DRMS
Type & Sequence
TR50
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
h <br />&V <br />Cripple Creek & Victor Gold MitSing Company <br />A Joint Venture ~ ANGLOGOLD ASHANTI (COLORADO) CORP., <br />Operations Office <br />P.O. Box 191 ~ 100 North 3'" Street <br />Victor, Colorado 80860 <br />(71 91 689-2977 -Fax (7191689-3254 <br />/~, <br />~.yrk, ~ w <br />SENT EXPRESS MAIL <br />June 29, 2007 <br />Mr. Berhan Keffelew <br />Environmental Protection Specialist <br />Colorado Department of Natural Resources <br />Division of Reclamation, Mining and Safety <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Permit No. M-1980-244: Cripple Creek & Victor Gold Mining Company ("CC&V"): <br />Cresson Pro'ect• - R uest for Technical Revision "TR-50" Skid-mounted tem o cazbon <br />columns <br />Dear Mr. Keffelew: <br />CC&V proposes the following minor change as part of this request for Technical Revision (TR- <br />50) to the Amendment No. 8 to Permit M-1980-244. This TR request includes the connection <br />and operation of askid-mounted set of five (5) cazbon columns and barren solution tank in order <br />to temporarily increase the flow of pregnant solution being treated by carbon recovery at the <br />ADR.. Attached is an arrangement drawing of the skid which is currently being refurbished by <br />Scotia, Inc. at their Sal[ Lake City facility. Each cazbon column is approximately 6-feet in <br />diameter and 9 feet tall, each capable of hold 1-1.25 tons of activated cazbon. The skid will be <br />delivered by truck and located along the northwest comer of the ADR plant within the primary <br />Phase 1 liner area. CC&V has confirmed by survey that the proposed location is within the <br />certified primary liner azea as shown in the attached drawing, which reports directly to the Phase <br />1 PSSA. The proposed location and it's relation to the Phase 1 liner system is shown on the <br />attached drawing. This azea will be filled to level and a berm with synthetic liner will be <br />constructed along the west perimeter of the mobilization azea to direct any unanticipated seepage <br />from the columns into the Phase 1 liner area. <br />RECEIVED <br />~Ul. 0 2 2001 <br />.~Divisi0n of Re51am€~~,cn, <br />Mlninp end gatety <br />
The URL can be used to link to this page
Your browser does not support the video tag.