My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990-01-25_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1990-01-25_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 10:52:31 AM
Creation date
11/21/2007 10:41:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
1/25/1990
Doc Name
PREHEARING ORDER IN MATTER OF BATTLE MTN RESOURCES INC PERMIT AMENDMENT FN M-88-112
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />II. ISSUES TO BE CONSIDERED <br />1. Presentations to the Board shall be strictly limited <br />to the issue of whether the application for the amendment of Bat- <br />tle Mountain's permit complies with the requirements of the Colo- <br />rado Mined Land Reclamation Act and the regulations promulgated <br />by the Board. The Board will not consider any issue relating to <br />the validity of the underlying permit, nor may the parties <br />present any evidence on such issues. Furthermore, the parties <br />opposing the amendment shall restrict their presentaticns to <br />those issues addressed in their respective statements requesting <br />party status. <br />2. Parties opposing the amendment shall be restricted to <br />presenting evidence on the following issues: <br />a. Project design, including: <br />1) Waste rock, tailings and pond management; <br />2) Hydrological controls; <br />3) Hazardous materials handling an9 storage. <br />b. Water quantity. <br />c. Emergency Response Plan <br />d. Financial warranty. <br />e. Revegetation. <br />f. Geochemistry of waste rock. <br />For these latter two issues, presentations shall be <br />limited to environmental consequences associated with new loca- <br />tions and modified geochemistry of the waste rock and Mailings <br />piles. Amore comprehensive listing of particular conccerns which <br />might be raised under the design issue is appended to this pro- <br />posed prehearing order. <br />III. PROCEDURE <br />The parties shall present their presentations in the fol- <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.