Laserfiche WebLink
<br /> <br />:~ <br />MEMO to C-96-013 NOV File <br />July 11, 1996 <br />Page 2 <br /> <br />• We discussed the issue of continued use of an unpernitted plan. <br />• Christine repeated that she saw no difference between an east pile and a west pile. <br />• Norm and Christine stated that they did not understand that additional use of the unpermitted <br />pile was a problem. <br />• I stated that we consider the ongoing use of an unpermitted pile a problem. <br />• I reiterated that during the close-out discussion on the day the problems were originally <br />noted, I discussed the need for permitting with MCC staff. I stated that during the <br />close-out, MCC staff indicated that the needed permitting would be provided within a few <br />days of the close-out. <br />M:\oss\gaw\013N0 V.dab <br />