Laserfiche WebLink
<br />Mr. Ralph Lopez -2- November 1, 1993 <br />Basin Resources, Inc. <br />2. If straw bales are used, then the features must be added to a certified map, per Rules <br />2.05.3(4) and 2.10. The operator must also maintain such structures. <br />D. SAE No. 9: <br />1. SAE No. 9 must be located and annotated on the map. <br />2. Please explain "add rock to 80%" in Table 1. <br />3. The SEDCAD run for SAE No. 9 does not include the topsoil pile accurately since the <br />pile has a different slope percentage and cover. Please rerun SEDCAD, incorporating <br />the topsoil pile in the design. <br />4. Please provide the SEDCAD run for the clean water diversion ditch. <br />E. SAE No. 10: <br />1. Please explain "add rock to 80°~.' <br />If you have any questions, please call me. <br />Sincerely, <br />~..-~.Rd . ~,~..~.Q <br />Y seph J. Dudash <br />Environmental Protection Specialist <br />JJD/bjw <br />c: Dan Hernandez (DMG) <br />Cathy Begej (Greystone) <br />m:\oss\bjw\jjd.pe3 <br />