My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV13098
DRMS
>
Back File Migration
>
Revision
>
REV13098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:24:05 AM
Creation date
11/21/2007 10:39:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980136
IBM Index Class Name
Revision
Doc Date
11/6/2002
Doc Name
Application
From
Lafarge
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT E: Reclamation Plan <br />The Reclamation Plan and planned end use for the site are the reason for the requested <br />Amendment. Lafarge, on behalf of the owner, has been requested to alter the reclamation plan <br />from the current planned end use of agricultural to an end use that will be consistent with the <br />Eagle County Master Plan for the Fairgrounds. The owners have requested Lafarge to contour <br />and reclaim the site in such a. manner that will minimize the additional work needed by the y <br />County to complete the Master Plan. <br />The affected areas will be reclaimed as open areas consistent with the Eagle County Master Plan <br />for the Fairgrounds site. This plan currently calls fora "mixed" use of trails, hiking, fishing, <br />open space, athletic fields, equestrian areas, parking lots, etc. A detailed description of the Eagle <br />County Master Plan's objective for the site can be found in the Eagle County Publication <br />"RECREATION MASTER PLANS" dated February 28, 2001. The side slopes will be regarded <br />at a 3:1 slope, the floor of the excavation will have approximately a 2 percent slope towards the <br />river with 4 inches to 8 inches of topsoil added. This is the same general plan that was used in <br />AREA A to the east. <br />Adequate topsoil for reclamation should be available for the agricultural areas from lands <br />initially stripped prior to the extraction process. If needed, additional topsoil can be obtained <br />from construction projects in the area that have excess fill material. The seed mix and <br />application rates to be used for the reclamation are the same as those currently being used <br />elsewhere on the site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.