Laserfiche WebLink
• Colorado Division of Minerals and Geology sheet 1 of 2 <br /> __________________________________ <br /> ESTIMATING FORM - EQUIPMENT MOBILIZATION / DEMOBILIZATION <br /> ......................................................... <br /> Task #... 4 Prep. by CLK Filename..M052-4 <br /> ------------ -------- ---------- <br /> Date... .. 25-Nov-97 Permit p M-83-052 Mine. .....Joker Mine <br /> ------------ -------- ----------------------------- ------------------------------------ <br /> Permit Action. . ...... Recalculation of financial warranty <br /> ---------------------------------------------------------------------------------------------- <br /> Task Description..... Mob/demob equipment <br /> ---------------------------------------------------------------------------------------------- <br /> HOURLY EQUIPMENT COST <br /> --------------------- NOTE - This is a list to select from, not a list of mandatory items to include. <br /> Mob/Demob Eqp. -Tractor 6x4, 75,000 lb GVW, 375 HP, diesel powered <br /> -Lt. Trailer 25 con folding gooseneck, drop deck <br /> -Med. Trailer SO ton folding gooseneck, drop deck <br /> -Hvy. Trailer 120 Ton folding gooseneck, drop deck <br /> -Pilot Car On-highway light duty truck, 4x2, 130 hp, 1/2 ton rating, gasoline powered <br /> -Hyd. Crane Grove RT58D rough terrain hydraulic crane, 20 ton capacity, 125 hp, 60 ft. boom <br /> -Fuel Truck 6x4, 3,600 gallon capacity, 210 HP, diesel powered <br /> -tube Truck 6x4, 2,500 gallon capacity, 210 HP, diesel powered <br /> -Flatbed Truck: 20,000 lb GVW, 175 HP, diesel powered <br /> Last pace: <br /> _____________________________________________________________________________________ <br /> December, 1994 <br /> "'------------ Lt. Rig Med.Rig Hvy.Rig Pilot Hydraulic Fuel Lube Flatbed <br /> Cost Breakdown: <-25 T. 26-50 T. a 50 T. Car Crane Truck Truck Truck <br /> .................................................................................................................... <br /> Ownership Cos[/hr - $25.74 $27.62 $J1.12 $1.72 $21.81 56.7E $12.48 55.81 <br /> Operating Cost/hr . $25.78 $27.34 $29.73 $5.23 $28.60 $18.12 $24.11 $7.98 <br /> Operator Cost/hr - $21.40 $22.03 $22.03 $21.24 $23.13 $21.24 $21.24 $21.24 <br /> Helper Cost/hr - $20.60 $21.24 $21.24 $0.00 $0.00 $0.00 $0.00 50.00 <br /> _______ _______ _______ _______ ------- ------- ------- ------- <br /> Total - $93.12 $98.23 $104.12 $28.19 $73.54 $46.14 $57.83 $35.03 <br /> _______ _______ _______ _______ _______ _______ _______ _______ <br /> NON-ROADABLE EQUIPMENT: <br /> "------------------ ' Weight Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT Permit <br /> Machine Description (tons) Cost/hr Cosc/hr (no. hauled) Cost/hr Cost/hr Cost/ea <br /> ---------------------- <br /> Cat D8N 40.00 $40.05 $98.23 2 $276.56 $196.46 <br /> Reveg. Equipment 15.00 $30.00 593.12 1 $123.12 $93.12 <br /> ....................... <br /> Subtotals $399.68 $289.58 50.00 <br /> --------- _________ _________ <br />