My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV12975
DRMS
>
Back File Migration
>
Revision
>
REV12975
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:23:57 AM
Creation date
11/21/2007 10:37:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
4/2/1984
From
ANACONDA MINERALS CO
To
MLRD
Type & Sequence
MT1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINING AND RECLAMATION PLAN February 1981 <br />MT. GUNNISON N0. 1 MINE Revised March 1984 <br />From Caterpillar Performance Handbook use D9H with 9D shank. <br />Seismic Velocity of Material = 3,000 feet/second. <br />Can rip approximately 2,300 yd .3/hour. <br />This is an average of ripping production under ideal and adverse conditions. <br />Use 70% machine availability/efficiency. <br />2,300 x .7 availability = 1,610 yd.3/hour. <br />The hourly rental and operating costs were detemined in the following manner <br />as recommended in the Rental Rate Bluebook for Construction Equipment <br />published by Equipment Guidebook Company. Values are based upon 80% of rates <br />(updated to 1984 dollars) listed in the Bluebook which is the normal discount <br />quoted by contractors. Calculations are based upon a 60-hour work week. <br />Estimated Usage (Hours/Week) 60 <br />Rental Costs <br />1. Total Rental Cost 340.28 per hour <br />2. Total Operating Costs 37.00 per hour <br />3. Machine Rental & Operating Costs 77.28 per hour <br />4. Operating Hour Wage 20.50 per hour <br />5. Total Rental and Operating Costs: 397.78 per hour <br />397.78/hour = Round to 398/hour <br />(1984 dollars) <br />Cost per acre <br />1613 yd.3 of material per acre can be ripped by a D9 Bulldozer <br />per hour. Therefore, total operating and rental costs per acre <br />of material = 398/Acre. <br />TOPSOILING FROM STOCKPI <br />Topsoiling requires approximately 18" cover as the most topsoil required. <br />(Previously, 8" of topsoil was required. These calculations are based upon <br />the new 18" topsoil requirement). <br />1.5' X 43,560 ft.2 X yd'3 = 2,420 yd.3/acre <br />27 ft.3 <br />For topsoiling use a scraper. <br />4-34e <br />
The URL can be used to link to this page
Your browser does not support the video tag.