Laserfiche WebLink
<br /> <br /> <br />3.4 HUHIDITY CELL TESTING: <br />(Please Hold Testing until approvah has <br />been issued) <br />SAMPLES TO BE TESTED: L396.6 - 2.0 S; L396.6 - 2!.1 S <br />Take a portion of both tailings specimens and sbt up for <br />humidity cell test. These test need to set up as soon aspossible. <br />They will be carried out for a period oL 10 weeks. This co41d change <br />as the test progresses. Potential changes range from cutti q the test <br />short of the ten weeks to increasing the test to 12 weeks. ach weeks <br />leacdate should be tested for pH, Conductivity, Suliate~ Acidity, <br />sad Iron. There is a possibility of expanding the list of parameters <br />foc any given week. <br />4.0 PRIORITY OF TESTING <br />I would like to ideally receive data on testing identified ~n section <br />1.0; 2.0; 3.1; 3.2 )the unleached tailiogs sample) i 3.3 (the <br />unleached tailings sample) by November 10, 1989. This dat~ is vital <br />for preparation of permits documents to be submitted fa rly soon. <br />Please keep me informed as to the status of the testing o~ a weekly <br />basis. <br /> <br />