Laserfiche WebLink
CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />Agency or organization name : DRMS <br />Task # : 011 State :Colorado PermiUjob # : M-1977.285 <br />Date : 09/18/2006 County :San Miguel Abbreviation :none <br />User: RCO Site :Sunday Mine Filename :M285-011 <br />Permif or other job action :Final reclamation (TR-02 updated) <br />Task description :Haul hackfill material for placement into vent shaft S-7 <br />:: ...;: <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />-Loader :CAT 950G high lift (2002) <br />Support equipment -Load area : NA <br />-Dump area : NA <br />maintenance -Motor grader <br />-Water truck <br />Cost Breakdown : ruck/LOad <br />Truck er Work Team <br />Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data flename : truck2 loader NA NA NA NA <br />Utilization-machine : 82 100 NA NA NA NA <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownership cosUhour: $34.89 $21.50 NA NA NA NA <br />Operating cost/hour: $39.21 $29.21 NA NA NA NA <br />Ripper op. cosOhour : NA NA NA NA NA NA <br />Operator cosVhour : $21.75 $32.78 NA NA NA NA <br />Unit subtotals : $95.86 $83.49 NA NA NA NA <br />Number of units : 3 1 0 0 0 0 <br />Group subtotals : Work : $371.06 Support : $0.00 Maintenance : $0.00 <br />Total work team cosUhour : $371.06 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 1,069 LCY factor: NA volume: 1,069 LCY <br />Source of quantity take-off ;TR-02 reclamation plan <br />Source of estimated swell factor :NA <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION~~ <br />Truck CaoaciN <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight: 2,550 pounds/LCY Struck volume: 76.40 LCY <br />Descr.: Sandstone Heaped volume : 21.40 LCY <br />Rated payload : 60,000 pounds Average volume : 18.90 LCY <br />Payload capacity : 23.53 LCY Adjusted volume': 21.40 LCY <br />Finat truck volume based on number of loader passes : 18.56 LCY <br />'truck volume ad~ustetl to not exce etl rated paNoatl or heaped volume <br />Loadino Tool Capacity : Job Condition Corrections : Site altitude (h.) : 6,000 <br />Rated capacity (nom. heaped) : 3.750 LCY Truck Loader Source <br />Descr.: Blasted rock -avg. blasted (75 - 90%) Altitude adj.: 1.000 1.000 (Ca[ HB) <br />Bucket fill factor : 0.825 Job efficiency : 0.830 0.830 (user) <br />Adjusted bucket capacity : 3.094 LCY Net correction : 0.830 ~ 0.830 <br />