My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-09-18_REVISION - M1977285
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977285
>
2006-09-18_REVISION - M1977285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:25 PM
Creation date
11/21/2007 10:37:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977285
IBM Index Class Name
Revision
Doc Date
9/18/2006
Doc Name
Bond Recalculation
From
DRMS
To
International Uranium (USA) Corp.
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Team Work cont'd Task # : 010 <br />Loading Tool Cvcle Time : Number of loading tool passes required to fill truck <br />Excavators and front shovels -machine cycle time vs. job condition rating : NA <br />-selected value within basic rating : NA <br />Track loaders -material descr.: NA <br />-cycle time elements (min.) : Load <br />NA Maneuver : NA Dump : 0.100 <br />Wheel and track loaders -unadjusted basic loader cycle time (load, maneuver, and dum( 0.550 minutes <br />Cycle Time Factors Loading Condition Description Factor (min.) Source <br />Material : Mixed material 0.020 (Cat HB) <br />Stockpile : Dumped by truck 0.020 (Cat HB) <br />Truck ownership : No adjustment -factor not applicable 0.000 (Cat HB) <br />Operation : No adjustment -factor not applicable 0.000 (Cat HB) <br />Dump target : Nominal targef 0.000 (Caf HBJ <br /> Net cycle time atljUS[menC 0.040 minutes <br /> Adjusted loader cycle time (total time per loader pass) : 0.590 minutes <br /> Net load time per truck `: 3.540 minutes <br />TfUCk CVde Time : ' bulk of 1st loader cycle completed during truck exchange if adj. loader cycle ti me <exchange time <br />Truck exchange time *': 0.00 minutes........ Adjusted for site altitude : 0.000 minutes <br />Truck load time: 3.540 minutes........ Adjusted for site altitude : 3.540 minutes <br />Truck maneuver and dump time: 0.95 minutes........ Adjusted for site altitude : 0.950 minutes <br />" set at o if exchange time < adj. loader cyde time Qruck exchange completed during 1 st loader cycle) <br />Truck travel (haul & return) time: Road condition :Rutted dirt, little maintenance, no water, 2" fire penetration <br />Haul route <br />Road <br />aegmem# Haul distance <br />(feet) Grade <br />res. (%) Rolling <br />res. (%) Total <br />resistance (%) Speed <br />(feet/minute) Travel time' <br />(minutes) <br />1 6,000 4.00 5.00 9.00 788 7.651 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Retum ro ute : Haul time": 7.651 <br />1 6,000 -4.00 5.00 1.00 3060 2.096 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />ninutes <br />• ravel time shown tar each segmem includes acceleration/deceleration adjustment Return time'": 2.096 minutes <br />"total haul and return time shown includes attitude adjustment Total truck cycle time : 14.237 minutes <br />Loading tool unit production : 314.62 LCY/hour...... Adjusted for job efficiency : 261.13 LCY/hour <br />Truck unit production : 78.23 LCY/hour...... Adjusted for job effciency : 64.93 LCY/hour <br />Optimal no. trucks/loading tool : 4 trucks........... Selected no. trucks/loader: 3 trucks <br /> Adjusted hourly truck team production : 194.80 LCY/hr <br /> Adjusted hourly single truck/loader team production : 194.80 LCY/hr <br /> Adjusted houdy multiple truck/loader team production : 194.80 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 5.49 Hours <br />Unit cost: $1.996 /LCY Total job cost: $2,134 <br />6 <br />sheet 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.