My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV12801
DRMS
>
Back File Migration
>
Revision
>
REV12801
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:23:46 AM
Creation date
11/21/2007 10:36:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
4/15/1986
Doc Name
MINING PERMIT COAL DECISION FORM PERMIT REVISION
Type & Sequence
PR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LC:,DOUT FRCM STOCKPILE TO PROCESSING <br />Cescription of Loadout (bulldozer, conveyor, etc.): N/A <br />Oes~ption of Controls (wa[erina, chemicals, etc.): <br />Loadout schedule: tons/hour <br />hours/day <br />days/year <br />PROCESSING <br />Tons/year of Material Subject to: Primary Crushing; Secondary Crushing <br />Tertiary Crushing: Recrushinc; Fines Mill <br />Screening; q Moisture Contanc (of raw material) - <br />% >'.c~stura Content (of finished material) <br />uescription of Controls (bagfilter, spray bars, etc.): <br />COPJVE'i0R AND TRANSFER PCINTS (IN PLANT) <br />Description of Controls for Conveyors: N-/A <br />(Indicate on separate diagram if mare than one conveyor system is involved) <br />Number of Transfer Points: <br />De~iption of Controls for Transfer Points: <br />Quantity of material conveyed: <br />Permanent Coal Refuse Pile <br />STOCKPILE (}F:{NK9.*i~XHRXP.ftOEE~Stc`0,(a1R'RE~~XIKX <br />Cubic yd s. or tons of: Coal; Rock~oal Refuse Other(descri6e) <br />100,000 CY/YR <br />Description of Controls: Water Truck and Reclamation <br />Method of Loading into Pile: Dumo Trucks, Compactor (sheepsfoot) and Dozer <br />Length of time stockpile remains undisturbed: The pile will be permanent. days <br />Reclamation will be carried out as phases are completed. , <br />LOADOUT FROM STOCK?ILE FOR FINAL TR;-PIS?^iT <br />Description of Loadout: Front-end Loader <br />Cescription cf Controls: Coal refuse is moist when it comes from underground, due <br />to dust sprays on conveyor. <br />Loadout ScneCule: 50 tcnsihour 8 hour;/Coy 240 Cavs/year <br />• <br />-~- <br />
The URL can be used to link to this page
Your browser does not support the video tag.