Laserfiche WebLink
<br />Cubic yards or tons of: Overburden; Coal; Rock:100,000/ Otner <br />year <br />_ouipment to be used (end loader, dragline, shovel, etc., include capacities): Refuse is <br />extracted underground and shipped out of the mine via covered conveyor equipped <br />-.rit-dust suppression crater sprays. This conveyor is covered under Emissions <br />P-eft No. C-13, 034-1 as is the breaker facility. <br />?rcduc; Transportation (include on and off property) by conveying and unpaved haul road: <br />No.of Trips Ave.Vehicle Mileage per <br />Caoacity No.of Trucks "lo.of Wheels oer day soeed day per Truck <br />1. N/A <br />tiaul <br />Tru:.:<s : 2. <br />z, <br />4. <br />!'aul 4c~i and =on,evor ^ista-ces: 1. <br />From To <br />2. <br />3. <br />4. <br />5. <br />De~iption of controls for unpaved haul roads: N/p <br />Description of Controls for Conveyors: <br />~ LOADOU7 TO ~^,RiZZLY OR STOCKPILE <br />Description of loadout (truck bottom dump, truck end dumo, conveyor, pneumatic elevator,etc.): <br />N/A <br />Descriotion of Controls (wa[erina, chemicals, etc.): <br />Cubic ids. or ;cns of: <br />STOCKPIL_ !RA'.:~~ <br />Overburden <br />Distance (mile=_) <br />Rock <br />Coal <br />TopsoilCoal Refuse 100,000 CY/YR Other(Describe) <br />~.e[`.cd o` loading into pile (ccnveyor, stocker, end loader, etc.): Diversion chute from <br />breaker to ground. <br />Controls: Water Truck Lenc_h of time stockpile renains uncis;rubed 12- 18 hours db`yf <br />c~ refuse is shipped out of the mine at night and hauled to main pile during <br />the next shift. Material is moist (10-15w) from dust suppression sprays <br />underground. <br />