Laserfiche WebLink
<br /> <br />10. No monitoring commitment was provided in the permit text for the alluvial <br />well to be established in section 11, T5N, R86W. Please include a <br />monitoring frequency for this well in the permit text. <br />11. How will subsidence affect the downstream well for the mining in panel <br />13 Right? This well will ultimately become the upstream alluvial <br />monitoring well for future mining to the north. What changes regarding <br />water level can be expected at this location following subsidence? This <br />site will require surveying of the top of casing following subsidence. <br />Please add this commitment to the permit text. <br />12. Water quality data was included in Table 9R for spring 58608-1. Where <br />is this spring located? It does not appear on Figure 5K. Please add this <br />spring to Figure 5K. <br />Comment to Janet: TCC is proposing to submit environmental monitoring for <br />Fish Creek in the Annual Hydrology Report. I am not sure this is the best way to <br />submit this information but I will leave that possible issue to you. <br />This concludes my review. If you have questions, please let me know. <br />CC: Dan Hernandez <br />• Page 3 <br />