Laserfiche WebLink
~,v <br />.. <br />s <br />IV, EntorcemenL Actions <br />' `3°~~' The following ideriti fies enforcement actions taken during tfiis irlspectlon~ the <br />' required abatement'and date of abatement for the violation, previous violations <br />.' still requiring abatement and the termination of violations cited during previous <br />inspections. ', . <br />NOV C-9'3-11~{'was issued for failure to submit proper permitting . <br />documents Por light-use roads on tiie mine site. There is a road , <br />which fits the definitiot,oY a light-use road (1.Oi.111(c)) located <br />arotrod Lhe base of the refuse pile. Information required in Rula <br />4.0:1.3 wne not submitted to the Division !or approval•'~s*ior to the <br />' construction of this road. in addition, there are some upper roads <br />' which were previously constructed Forest Service roads and <br />exploratory drilling roads which are now used by MCC to access <br />• monitordn~ stptio,ps aid t}~a ~.up~er„~neadosa. ,. MCC's permits states <br />- thatthey }iava he! Cher cbns'tr(icL'e$ or.m~intaified any light-uae'rodds • <br />on the mine site. Rule 2.05.3f3)(c) requires that the permit <br />contain a description of each road to be constructed, used, or <br />maintained within the permit area. The description shoulri include <br />a map and appropriate cross-creations along with a nyp(,b~.r of other <br />specific requirements detailed i'n t:his regulation. In order to, <br />abate the r•iolation, the company is required to provide the proper <br />and adequate permitting documents pursuant to the two previously <br />reference rules for all light-use roads on the mine site. <br /> <br />• s 1 ~• ~ ~ <br />_ y a i i. , ~ <br />NOTE: Attach appropriate VIOLATIONS OR CESSATION ORDER COOING FOAMS <br />.~..~ <br /> <br />Revlsea: 4/BB <br />Doc. No. B101F <br />6 <br />