Laserfiche WebLink
C. E. Johnston -3- July 12, 1993 <br />10. The source of non-toxic non-combustible material to cover coal <br />waste is the loadout bench. See the response to item 8 above. <br />11. I am unable to respond to the Division's questions regarding <br />topsoil replacement at this time. TCC has contracted with a <br />local surveying company to determine the amount of topsoil <br />that is contained in the topsoil stockpiles. Once this <br />information is obtained, (in about two weeks), the quantity of <br />topsoil available for replacement will be available. <br />Since this is the first round of correspondence regarding the bond <br />and reclamation plan, this information will not be presented in the <br />form of a minor or technical revision. After you have had a chance <br />to review and comment on this information and the topsoil quantity <br />issue is resolved, an application for a revision will be processed. <br />Please call if you have any questions. <br />Sincerely, <br />Jim Stover, P.E. <br />Consulting Engineer <br />cc: Relly Fritzler <br />